Located on a secure 75-acre-campus, phase two of this two-phase project incorporates the new construction of a 120,000-square-foot fleet maintenance building for Lincoln Electric System. Large enough to hold two football fields, the maintenance building features wash bays, overhead cranes with 190-foot span for steel beams, full-service auto mechanic stations with oil/fluids, and 13 total garage doors.
Winner of the Building Project, $50 Million and Greater for the Associated General Contractors (AGC), Nebraska Building Chapter.